The initial project was raised in March 2010 to address the need for a high-tech stage that is capable of hosting major productions in Peru. The architect Alonso de la Piedra was responsible for directing the project for the construction of general infrastructure and the architect José Nepomuceno was in charge of the acoustic and mechanical structures. Lima